750hp workover rig mud system package

Specifications for 750hp workover rig mud system package

Complete Mud system package for 750hp workover rig including but not limited to the following:

3 Mud Tanks, volume of each 40 cubic meters, for 750hp workover rig mud system package.

oil rig mud system
oil rig mud system

Mud Tanks Specifications of the 750hp workover rig mud system package

API Skid I Beam, API lifting.

Bottom tanks steel sheet 12 mm thickness

Side Walls of corrugated steel 40 mm thickness

Suction Line in bottom 8” x 6” Schedule 80

Drain line with 10” butterfly valve

Top ream of 4” pipe schedule 40

Equipped with all required butterfly valves

Tanks to be covered with API Grating & with API Hand Rails

750hp mud system package Mixing tank of 2 compartments equipped with the following

6” Mud Hopper

2 Mud guns

2 Mud Agitators

Two Mission Type centrifugal Pumps (8×6-14) 75 HP

Active Tank for the 750hp workover rig mud system of 2 compartments equipped with the following

2 Mud guns

2 Agitators

Desander

Shale Shaker Tank for the 750hp workover rig mud system equipped with following

Two Shale Shakers rated capacity up to 600 GPM, and sand trap.

 

Oil and gas drilling atmospheric Mud Gas Separator

Mud Gas Separator, also named poor boy degasser. It is common but necessary equipment for oil and gas drilling field. It is similar like a fire extinguisher to the oil and gas drilling field. Normally, it may do not need to be used. But once it is necessary, there should be risking condition need to be controlled reliably and properly to avoid disaster.

mud gas separator
mud gas separator

Definition of atmospheric Mud Gas Separator (poor boy degasser) for oil and gas drilling

Atmospheric Mud Gas Separator (poor boy degasser) is a kind of mud gas separator with directly gas outlet pipe (vine line) on top of the separator and discharge gas directly to the environment, without matched with flare igniter. GNZYQ1000A Mud Gas Separator equipped 3m to 10m vent line to discharge gas to the environment. In the condition of vent line pipe over 5m in length, it should be 3 places stretch lines to fasten it.

Function of Mud Gas Separator (poor boy degasser)

Gas cut fluid influx into mud gas separator, when go through the find fine hole, gas will be smashed and go out from the vent line from top, fluids will fall into the mud gas separator tank. Pipe line of atmospheric Mud Gas Separator (poor boy degasser) Vent line: 8” OD vertical outlet height 3 ~ 10m, with flange connection to the separator body for easy transport. Fluids outlet U-tube: OD 8” and fluids sealing height 10 ft. Fluids Inlet pipe: OD 4”, API standard

Other types of Mud Gas Separator (poor boy degasser)

Atmospheric Mud Gas Separator (poor boy degasser) discharge gas directly to environment, while another type is flare mud gas separator. Flare mud gas separator connected with a flare ignite. The vent line is with min. 50m in length and lead the gas to remote area away from drilling rig hazardous area and fire it.

Drying shaker with sump tank

World top manufacturer for solids control and drilling waste management equipment, they get an urgent request to deliver one high G shale shaker with one sump tank to be used as drying shakers for OBM (Oil based mud) cuttings.

Below is the detailed request of customer:

1- Quotation for drying Shaker and related skid itself.

2-  Quotation for 15 bbls sump tank with 1 x 4”  Flange and 1 x 2” Flange connection; the customer also attached pictures of a drying Shaker with sump tank.

3-  Shaker Screen: 140 API Size and 120 API Size.

4-  Two years spare parts.

For the sump tank, GN Solids Control engineer cannot make sure the position of the flange and inlet or outlet just for customer attached pictures,  so we put forward questions to specify following for quick solution:
1)  Please you send us drawing of the sump tank in order to see connection of the drying shaker,inlet & outlet, size, flange connection?
2) Or pls send us more pictures from different views to show item 1 information.

high G drying shaker
high G drying shaker

The customer give answers very soon as below:

1) We intend to install a shaker on a tank that length and width of the sump tank is exactly same as drying shaker length and width basket and we want the height of the sump tank to be at range of 1 m.

2) We need two flanges by 2″ and 3″ size to be installed on width side close to the bottom the tank to be able to connect a Welden pump (air supply type) and suck collected oil for the sump tank that has been installed below the H-G Drying shaker into the active mud system.

And customer further request: for drying shaker, they usually don’t need the back buffer box.

Based on above information, GN Solids control engineer give proposal as below:

1) High G drying shaker model GNZS594HGE-LD, with hoper feeding on shaker top for drilling waste management system.

2) Sump tank with length and width is exactly the same as drying shaker length and width basket, and total height with skid is 800mm for usable capacity 15bbls

3) Further more, GN Solids recommend its screw conveyor to transfer cuttings from solids control shaker to the high G drying shaker. Customer is satisfied and give orders.

GN500 GPM mud recycling system for Saudi Arabia HDD rig

There is a cleaning Tank for GN500 GPM mud recycling system for Saudi Arabia HDD rig, the tank is divided into 3 compartment, 1# Shaker compartment, 2# De-sander compartment, 3# Mixing compartment.

Detailed process features of GN500 GPM mud recycling system for Saudi Arabia HDD rig

1) Continues feeding of dirty slurry from mud pit to Shale Shaker.

The GN100YZ100A-30 Submersible slurry pump feed slurry from mud pit to GNZS703E Shale Shaker at capacity of 528 GPM.Slurry pump is made from Cr26 Abrasion resistant Alloy which allow users to pump high solids content fluids.

GN500 GPM mud recycling system for HDD
GN500 GPM mud recycling system for HDD

2) Pre-screening of the returned mud using GNZS703E Shale Shaker for the GN500 GPM mud recycling system for Saudi Arabia HDD rig.

This shaker can handle a throughput of more than 528 USgpm and is designed to remove particles down to 250 microns(60mesh) @ 7G force linear motion GNZS703E Shale Shaker with big screen area (2.63 ㎡)

3) Secondary and third cleaning of the returned mud using a GNZJ703E (10″×1 + 4″ × 8) Mud Cleaner.

1# GNSB5×4A-13J Centrifugal pump feed mud from 1# Shaker compartment to feed 10″×1 de-sander cones, where the particles larger than 50 microns are separated out by centrifugal force from desander cone nipple, and get down to GNZJ703E mud cleaner bottom shaker with a finer screen (150/200mesh) which again produces a virtually dry product. Major fluids with particle size less then 50microns goes to 2# De-sander compartment. This is the 2nd phase solids control of the GN500 GPM mud recycling system for Saudi Arabia HDD rig.

2# GNSB5×4A-13J Centrifugal pump suck mud from 2# desander compartment and feed to 4″x8 desilter cones. Where the particles larger then 16microns are separated out by centrifugal force from desilter cone nipple, and get down to GNZJ703E mud cleaner bottom shaker with a finer screen, which again produces a virtually dry product. Major fluids with particle size less than 16 microns goes to 3# Mixing compartment. This is the 3rd phase solids control of the GN500 GPM mud recycling system for Saudi Arabia HDD rig.

4) Integral mixing system using GNSLS35A-300 Jet Mud mixer for GN500 GPM mud recycling system for Saudi Arabia HDD rig.

This GN500 GPM mud recycling system for Saudi Arabia HDD rig allows fresh mud to be prepared very rapidly from bentonite powder. One of the 2 pumps on tank end is dedicated to this function allowing continuous mixing or recirculation as required.

GN500 GPM mud recycling system for HDD
GN500 GPM mud recycling system for HDD

5) Integral charge pumps to supply clean mud back to the drilling rig.

The mixing pump above is a dual function pump, on mixing pump outlet with a T pipe can be controlled by a valve to provide a continuous supply of clean mud from 3# mixing compartment under pressure to the high pressure mud pump, avoiding problems of starvation and cavitations which can rapidly cause damage.

gn Decanter Centrifuge using and mainteance

GN factory produced mud cleaners all over the country in all oil and gas fields. Overall, this Decanter Centrifuge with large-displacement, high pressure, less wearing parts, easy maintenance, low weight and small size, a series of advantages, is adapted to the needs of modern Jet drilling technology a good device. In the last few years, GN technicians of the company for the use of this type of mud cleaner has done some research work. Also found some problems, worth designing and manufacturing units and user attention.

Mud cleaners, widely used in the construction of water projects, sending smoke fiber-containing mud, stones and other impurities. Ordinary mud cleaners, high energy consumption, low efficiency, overcurrent short service life and maintenance disassemble frequently. Therefore, preparation of high effective Grout Cleaner is imperative. According to the features of mud cleaner, combined with NL100-118 design of centrifugal mud pump and explore its hydraulic design method, key parts of the manufacturing process, sealing joints, such as selection of material. Design parameters are: flow rate: 160 m3/h; Head: 18m; Efficiency: 68%; Speed: 146 or/MSN; Number of leaves: 3; Impeller blade streamline imports a distorted involute shape.

Decanter Centrifuge

LWF450x1000N Mud cleaner is really a center spead centrifuge along with sixty-M3 treating capability as well as 5-7 microns splitting up. This particular shale shaker is extremely popular depending on it’s broad programs as well as discounted. However for many ALL OF US customers they’ll select a higher pace design or even variable spead centrifuge. All of us simply obtained four models associated with higher pace centrifuge final 30 days as well as additional solids manage tools.

Besides Mud cleaner, GN additionally produce shale shaker, dirt solution, desander & desilter, centrifugal pump motor, dirt agitators, dirt container, aircraft dirt machine, and so on. GN additionally produce the entire type of solids manage program in addition to little dirt program with regard to HDD CBM as well as gemstone drilling. Visit here (http://www.gnsolidsamerica.com/company-profile.html)

The top 10 largest Land drilling rig companies in China

Mud recycling system for oil and gas drilling rig a very important part for drilling rig. Smart buyer will separate the mud system with rig rig. And GN Solids Control as the biggest solids control exporter in China is their best choice.

As China top 1 solids control company, in many cases, the customer will inquire GN better brand of land drilling rig. They now give list of the top 10 land drilling rig manufacturer companies in China.

Baoji Oilfield Machinery Co., Ltd (BOMCO), as the leading enterprise of R&D and manufacture of oil drilling rigs and production equipment in China, It is the earliest established, largest and most powerful oil drilling rig and production equipment developer and manufacturer under CNPC, the largest research and production base of land rigs and series mud pumps in the world, and also the largest and most powerful base for R&D and production of wire ropes for special purposes in China.

Mud cleaning shale shaker for drilling rig
Mud cleaning shale shaker for drilling rig

Lanzhou LS-National Oilwell Petroleum Engineering Co. Ltd. (LS-NOW for short) is a Sino-American Joint Venture established between Lanzhou Petrochemical Machinery Equipment and Engineering Group Corporation (LS Group) and National Oilwell International, Inc. (NOI). Scope of business: design, develop and manufacture complete land and offshore drilling rigs and workover rigs, and provide equipment package, components, fittings, parts and full services.
Main products: serial drilling rigs that are electrical or mechanical or electrical-mechanical compounded driven and suitable for different applications such as land, shallow, offshore and desert and meet the requirements of drilling and workover services. The drilling depth ranged from 1000 to 9000 meters.

Sichuan Honghua Petroleum Equipment Co., Ltd., established in 1997, is a subsidiary of Honghua Group which has been listed successfully in the Stock Exchange of Hong Kong. The company has been engaged in research, design, manufacturing and general assembly of oil drilling rig and equipments for oil exploration and development. Now it is the world’s second land drilling rig manufacturer, and China ‘s largest exporter of drilling rigs.

The company produces mainly various land drilling rigs for drilling 1000m to 9000m wells and offshore drilling modules– DC drive drilling rig, AC VF electric rig, mechanical drilling rig, composite drive rig, trailer mounted rig and independent RT electric drive drilling rig, as well as their matched equipments, i.e. drilling pumps, traveling block system, solid control system, electric control system etc.

750hp drilling rig mud system running in Middle East
750hp drilling rig mud system running in Middle East

RG PETRO-MACHINERY (GROUP) CO. LTD is one of the largest manufacturers for petroleum drilling rig equipment in China. It is a stock company, reorganized from Nanyang petroleum machinery plant (former No.2 Petroleum Machinery Manufacturing Plant of National Petroleum Industrial Ministry of China). As a former national technical equipment production base, authorized by former national economic and commercial committee of China, RG PETRO-MACHINERY (GROUP) CO. LTD has become a company for national new product trial production of China, light-duty drilling rigs production base of SINOPEC and a high-tech enterprise in Henan Province.

RG PETRO-MACHINERY (GROUP) CO. LTD, with its technical center, information center and quality inspection center at provincial level, has possessed 16 production plants for forging, metal machining, heat treatment, steel-structure manufacturing, general assembly, painting and new product trial production, and 3 comprehensive testing sites for drilling rigs as well as 2 Sino-American joint ventures and 2 share-holding joint ventures.

SJ Petroleum Machinery Co. , one of petroleum drilling  rig and production equipment backbone manufacturers and Manufacturing Base for National Key Equipment (Workover, Cementing and Fracturing Equipment) recognized by National Economy and Trade Commission, has provided lots of advanced equipment to domestic customers in lieu of expensive imported equipment, and played an important role in increasing profits of petroleum industry and decreasing domestic oilfield development cost.

6)       Kerui Oil drilling rig

Shandong Kerui Holding Group is located in Shengli Oilfield the second largest oilfield in China. Its arranges a wide range of businesses covering the scientific research and manufacture of the petroleum drilling equipment and oilfield engineering technical service. The main products manufactured and supplied include drilling equipment, Oil pumping equipment, Special equipment for oilfield, Oilfield tubing system and auxiliary machines and tools. Kerui can manufacture various workover rigs and drilling rigs with drill depth from 3000m to 9000m. All products meet API standard.

(Shanghai) petroleum equipment co., ltd. is established on August 2001. the 3H is the first rig manufacturer that introduces ship-building technology to the fabrication of petroleum equipment.

The 3H is conferred as:
– the high-tech enterprise of shanghai municipality;
– the advanced technology enterprise using foreign investment of shanghai municipality;
– the core enterprise with well-known product of hongkou district of shanghai municipality;
– the recommended demonstrating enterprise of intellectual property of shanghai municipality.

Main business activity covers the design and manufacture of the following series of:
– electrical, mechanical drilling rigs, and electro-mechanic rigs with the drill depth from 2,000 meters to 9,000 meters;
– module offshore drilling and workover platforms, module offshore drilling rig, polar drilling rigs, and truck mounted rigs;
– electrical driving control and system, and;
– main rig components of crown blocks, traveling blocks, hook, mud pump, swivel, and etc.

Shengli Oilfield Highland Petroleum Equipment Co., Ltd Established in 1992 was a private incorporated manufacturer of petroleum equipments located in Dongying city, Shandong province, the PRC. Through many years development, the company had been recognized and become well-known in petroleum industry achieved the superior position in the field of scale, product quality, technology ensuring and selling service and so on in petroleum equipment manufacturing in China.

Please contact GN Solids Control for more and detailed contact information for more China largest oil drilling rig manufacturer company information.

 

 

High G and Vertical G dryer for drilling waste cuttings

High G shale shaker (H-G) is a kind of dryer machine used for drilling cuttings waste management.Vertical G cuttings dryer (V-G) is anther dryer machine for drilling cuttings waste management.

Many customer wondering the difference of the 2 kinds of dryr and do not know how to choose the suitable one.

High G shale shaker (H-G) VS Vertical G cuttings dryer (V-G)

GNZS594 High G shaker dryer
GNZS594 High G shaker dryer

1) Price of Vertical G cuttings dryer (V-G) is much more higher than High G shale shaker (H-G)

2) Their application field is different. High G shale shaker (H-G) is mainly used to treat water based mud drilling cuttings. While Vertical G cuttings dryer (V-G) mainly used to treat oil based mud drilling cuttings

3) High G shale shaker (H-G) can be used to separate oil based mud drilling cuttings, while Vertical G cuttings dryer (V-G) cannot used to treat water based mud drilling cuttings

Vertical G Cuttings Dryer
Vertical G Cuttings Dryer

Difference of High G shale shaker (H-G) & Vertical G cuttings dryer (V-G) for oil based mud (OBM)

Both High G shale shaker (H-G) & Vertical G cuttings dryer (V-G) can be used for oil based mud, but there is difference on performance.

High G shale shaker (H-G) can reduce the oil on cuttings (OOC) to 15~20% after treatment. For many customer, it is not dry enough. Other treatment process is necessary. But the Vertical G cuttings dryer (V-G) can reduce the oil on cuttings (OOC) to 3~5%. The discharge from Vertical G cuttings dryer (V-G) can take away directly for road construction or other function. Or Feed to Thermal Desorption Unit for further treatment.

GN Solids Control is the only 1 API certified solids control company who can make both High G shale shaker (H-G) & Vertical G cuttings dryer (V-G) in China. For more information of the dryer machine, contact GN group freely.

China Manufacturing Base:

Company Name: HeBei GN Solids Control Co.Ltd.

HQ Address: No.3 Industry Road,Dachang Chaobai River Development Area, Langfang,China 065300

Tel: +86-316-5276989 / 5276988 / 5276990

Fax: +86-316-5276997 / 5276990

Email:sales@gnsolidscontrol.com

Web: Http://www.gnsolidscontrol.com / www.gnsolids.com

Texas, USA Branch:

http://www.gnsolidsamerica.com

For Russia Market:

http://www.gnsolidscontrol.ru

Shaker screen sealing rubber

There are rubber ring for sealing on most shaker screen model, like Derrick503 screen, Derrick48-30 shaker screen, Brandt Cobra shaker screen, GN Solids shaker screen, and many other shaker screen models.

Functions of the sealing rubber:

1) Sealing between screens and shaker deck. To avoid un-treated dirty mud seep into mud system, and damage the mud system machine.

shaker screen sealing rubber
shaker screen sealing rubber

2) To reduce the bad effect of vibrating to the shaker screen. Protect screen from strong vibrating.

What will happen if the sealing rubber not workable

1) The screen frame will touch directly with shaker deck, and damaged within a very short time

2) The worst result is, if the screen rubber damaged, the dirty mud from well head will flow into mud system directly with much solids. It requires a higher capacity on downstream equipment processing, or even make damage to the downstream machine, like desander, desilter or vacuum degasser

If the material of the sealing rubber not strong enough and not very good at anti-corrosive, the high temperature drilling mud with heavy sand will damage the rubber very soon. The shaker screen will be broken very soon. Dirty mud flow into the mud system from the shale shaker deck with heavy sand and solids. It will have bad effect to the mud system.

GN Solids Control utilzie high quality material for sealing rubber. They can offer high quality shaker screen with reasonable price.

20 foot containerized dewatering unit for drilling mud centrifuge

GN Solids Control has already developed the 20 foot containerized dewatering unit for drilling mud recovery, as without the chemically enhanced technology, operators would be left with the accumulation of colloidal and ultra-fine drilled solids in the drilling mud circulating system.  Ultimately leading to excessive mud densities, pipe torque/drag, mud loss, disposal fees, and overall well cost.

GN 20 foot Containerized Dewatering Unit

GN 20 foot containerized dewatering unit including all the components for adding chemicals, dewatering polymers,and mixing systems. The dewatering unit control system is organized by the PLC system to allow automatically operation. The customter mostly use the dewatering unit for water based mud.The result is a polymer-enhanced flocculation of colloidal and ultra-fine drilled solids that can be efficiently removed by a GN high Speed decanter centrifuge.

The customer can choose to have the decanter centrifuge on a separate skid or included in the dewatering unit container, in such case the container should be 40 foot size to have enough space for setting up the centrifuges and the feeding pumps.

Dewatering Unit
Dewatering Unit

Some case studies for the drilling mud  dewatering unit

The Dewatering unit application at the well allowed reduction of the liquid-waste volume by 32% for the first two sections and by 27% for the entire well. Around 350 m3 of water was returned to the system for fresh drilling fluid mixing thus reducing the cost of water delivery. All drilling fluid left after the last section was also processed through the Dewatering unit and the returned water was used for completion operations. Although application of the Dewatering unit added additional upfront cost to the well construction, the waste-volume reduction allowed a 20% waste disposal saving as compared to offset wells. Continue reading “20 foot containerized dewatering unit for drilling mud centrifuge”

500GPM mud cleaning system equipment

500GPM is a very common capacity for mud cleaning system. How to choose the right equipment for 500GPM mud system system.

Below is a standard proposal from world top solids control specialist – GN Solids Control. GN now have a complete set 500GPM mud cleaning system in storage for sale:

Solids Control Equipment for the 500GPM mud cleaning System

500gpm mud cleaing system for sale1) One Linear Motion Shale Shaker GNZS703
2) One Mud Cleaner with Desander / Desilter
3) Centrifugal Pumps 6×5 (37kw) for feeding to desander/ desilter
4) 40 Feet Size length and width ISO container size with fast fixing on trailer.
5) Centrifugal pumps completed with mixing hoppers for you drilling mud mixing.
6) Transfer function for transfering clean mud to the drilling rig mud pump.
7) Mud Agitators and Mud guns for agitation of the mud.
8) High quality mud tank attachment for easy operation and safety, Handrails can be fold up to the side of tank without removing during shipment.

Mud tank size for the mention proposal of 500GPM mud cleaning system is a common standard; it can meet the shipment limitation of most countries. GN can also customize other tank size per customers’ requirement on tank storage capacity.

For equipment, GN can also change other model per different requirements of different jobsite. For some jobsite, they may only need separate desander and desilter without the underflow shale shaker, it is also option.

For a more exact proposal, no hesitate to contact GN Group now.