Solids control system,solids control equipments,solids control manufacturer,waste management

Talk Online      China & USA Based
Drilling Waste Management Unit to Western Africa
Thursday, 28 August 2014 02:56

Drilling waste management have two common ways to treat and recycle: on line drilling cuttings treatment and base mud recycling; off line oily waste sludge removal and treatment. On line waste management is relatively easier to handle because of the flowability, lower density, lower viscosity, the drilling cuttings can be transfer to vertical cuttings dryer directly after discharged from shale shaker. Off line waste management may require more process to get better results.

GN Solids Control is China leading manufacturer for solids control & waste management equipment. GN decanter centrifuge & GN cuttings dryer have been used in many drilling waste/ drilling sludge projects. Recently, we have one drilling waste management unit ready for delivery. The customer is famous oil service company/environmental service company in Western Africa.

GN vertical cuttings dryer

Video of GN decanter centrifuge for water based mud: http://www.gnsolidscontrol.com/video/water-based-mud-decanter-centrifuge-argentina

Video of GN cuttings dryer for water based mud: http://www.gnsolidscontrol.com/video/vertical-cuttings-dryer-water-based-mud-drilling-waste

 

 
Tunnel Shield Project 500gpm Mud System to Thailand
Tuesday, 12 August 2014 02:07

Shield Method is one fully mechanized underground construction Method. The shield machine will be pushed forward, the surrounding rock will be supported by shield shell and segment. At the same time, excavation of soil will be conducted at the front of the excavation face by cutting device; the soil will be carried out by unearthed machiner. After that, the shield machine will be pushed forward again by jack and assembling precast concrete segment, this is the general formation process of tunnel structure.

Tunnel Boring Machine (short as TBM) and Mud system is indispensable for tunnel shield project. TBM as main equipment, mud system as auxiliary equipment to make the TBM working in a high effeciency way. Recently, one Thailand customer bought one set 500gpm mud system to match with TBM machine for Tunnel shield project. Follow to read more about this case.

The 500gpm Mud System Technical Parameters

  • One unit of double deck 6 panel shale shaker, GNZS706 with upside 3 panel coarse mesh shaker screen (2mm) and downside 3 panel fine mesh shaker screen ( 40mesh). The upside shaker screen area 2m2; the downside shaker screen area 2.6m2.
  • One unit of mud cleaner or mud conditioner, GNZJ703-8N with 3 panel deck shaker and 8 pcs X 4inch desilter cones. The separation points 25-40 microns.
  • One unit of centrifugal pump (37kw) for feeding desilter cones, the feeding pressure should reach 0.25-0.4Mpa; GN centrifugal pump is interchangeable with NOV mission pump. GN can also offer complete range of spare parts for NOV mission pump.
  • Two unit of mud agitator (11kw) to suspend and mix the drilling fluids.
  • Two unit of mud gun (2inch, fixed installation type) to working together with mud agitator.
  • One unit of mud tank with 4 compartments.
  • One unit of separate mud mixing unit, GN jet mud mixer with one mud hopper and one centrifugal pump (37kw). This unit can help supplement drilling mud to the system or add necessary chemicals or water.

500gpm mud system