Well servicing rig mud system

Well servicing rig is also called workover drilling rig,GN Solids Control design and supply well service drilling rig mud system clients all around the world.

Well servicing  RIGS: Land-based workover rigs (commonly referred to as well servicing rigs) consist of a mobile carrier, engine,

Well Servicing Rig mud system
Well Servicing Rig mud system

drawworks and a mast. The primary function of a workover(Servicing) rig is to act as a hoist so that pipe, sucker rods and down-hole equipment can be run into and out of a well. Land-based workover(Servicing) rigs are easier to move between well sites and different geographical areas of operations than drilling rigs. Typically, the rigs are self-propelled and have less auxillary equipment to move. Because of size and cost considerations, workover(Servicing) rigs are used for these operations rather than the larger drilling rigs.

Well servicing drilling mud systems:

Tuesday, 05 October 2010 01:56
We just finished the production of 2 sets solids control equipments for the repeat order from a Kuwait company.Our valued client from Kuwait is a big drilling company,this time they are going to set up 6 workover drilling rigs.Firstly,the need 2 sets solids control equipments urgently.
Monday, 28 December 2009 13:04
Two mud tank systems for workover drilling rig are going to be delivered from GN Solids Control Factory to Indonesia. From this news 5 Solids Control System Order in 10 Days,you will see we are still building another 3 mud systems,actually,now GN still have another 5 drilling mud systems in production.

Saturday, 19 June 2010 06:06
Two Sets of XJ450 HP Workover drilling rig solids control system are ready for delivery to Indonesia. It is for our Chinese drilling and workover service company, their activities are mostly for Indonesia.
After several solids control system being sent to Indonesia, and many solids control components such as desander and desilter vacuum degasser, sand pump, drilling mud mixers, etc. Our products have accepted by several oil and gas drilling companies and oilfield contractors.

Saturday, 24 July 2010 02:42
Another 2 Sets XJ550 HP Petroleum Workover (Servicing) Drilling rig solids control mud system are finished within 40 days ready for delivery to Kazakhstan.These 2 mud system is capable to work for temperature -30℃ to 55℃,there are heating pipelines for hot stream circulation around the mud tanks.GN also offered customized design according to client’s requirement for lower height of the Shaker.GN install the Shaker directly to the mud tank withough Skid.

Leave a Reply

Your email address will not be published.