Fluid Mud Plant Chinese Supplier

If you want to do more work than solids control, maybe you need a mud plant, used widely in offshore project, or waste management and so on. Also sometimes, all solids control part, solid liquid separation part being called plant.

mud plantIt do not make too much sense if entangled to the definition point. What GN Solids Control can do for you:

1. Solids Control part

2. modelling of plant and site layouts

3. Mud tanks:  Drilling Fluid Storage Tanks; Mixing Tanks; Bulk Tanks;

4. High volume mud mixing and shearing systems

5. Operation and Maintenance Guide

6. Cutting dryer (coming soon), decanter centrifuge and so on.

Continue reading “Fluid Mud Plant Chinese Supplier”

HYDROCYCLONE TANK COMPARTMENTS

In oil drilling, hydrocyclones usually refer to 10 inch desander cones and 4 inch desilter cones. And use desander cones & desilter cones to separate different size solids content.

For each kind of cones, need one separate tank compartment. Generally, a desander and a desilter manifold are available as part of the rig equipment. Hydrocyclones should process all drilling fluid entering their suction compartments independently of the drilling-fluid circulation rate.hydrocyclone

The flowability requires the system operating continually. Suction is taken from the tank immediately upstream of the discharge tank. The number of cones in use should process at least 100% but preferably greater than 100% of the flow rate of all fluids entering the suction tank for the hydrocyclone.

A backflow between the hydrocyclone discharge and suction compartments of at least 100 gpm usually ensures adequate processing. Estimations based on rig circulation rates are usually inadequate if the plumbing is not arranged properly.

GN Solids Control usually choose 3 phase separation for HDD and other compact system for HDD and other similar projects. To keep a better result for the drilling fluids separation. Specially designed cones ensure the result.

Top Big Bowl Centrifuge Suppliers

Big bowl centrifuge is widely used in drilling mud solids control system, also in tunneling mud processing system. “As a professional company of solids control system, GN Solids (some clients like to take this for short) must sell it, we are expecting that”; as one customer told us. We should say, GN is doing this, hopefully it will be done early 2012.

Keep tune to GN Decanter Centrifuge.

There are three types of decanter centrifuge widely used in drilling field:big bowl centrifuge
1. Small centrifuges – the diameter is less than 14 inch (355mm,356mm) and its volume capacity is 10 – 100 gpm (2.3-22.7 cubic meters).
2. Medium centrifuges – the diameter is around 15-16 inch (381mm,406mm) and its volume capacity is 30 – 150 gpm (6.8-34.1 cubic meters).
3. Large centrifuges – the diameter is more than 16 inch (406mm) and its volume capacity is 60 – 200 gpm (13.6-45.5 cubic meters). Continue reading “Top Big Bowl Centrifuge Suppliers”

Top Electric Motors Suppliers

Electric motor is an important part for a lot of equipment for driving. Everybody know this well. GN Solids Control have cooperated with some manufacturers supplying good quality products. Professional engineers also know a lot of famous brand. Here is a list to share some of them.

1. Siemens Motor
mud agitator with top quality motor

We cooperated with Siemens, when I talked about this with our customer, they usually want to know more, “Siemens is a huge company, so what do you buy from?” Yes, motors, and some parts for electric control and so on. You can get more when you contact.
2. Schneider
The global specialist in energy management. Some of our clients told us: We just like Schneider. Do not mind, GN Solids Control like all top quality products.
Continue reading “Top Electric Motors Suppliers”

Introduction of Thermal Desorption Technology

The use of thermal desorption technology or thermal desorption units (TDUs) to recover oil from drill cuttings has been well documented in the industry  and a detailed study of all available technology and processes was published by Halliburton in 2004.3

In summary, thermal desorption of oil from drilling cuttings for environmentally acceptable disposal of the cuttings was identified as an option in the early 1990s. The technology used for this purpose evolved significantly in the intervening years. In Europe and South America, the processed cuttings typically measure less than 1% of Total Petroleum Hydrocarbons (TPH) before disposal in landfills and this was the target selected for the subject project.

Regulatory agencies in other areas have also set standards for the levels of TPH in cuttings prior to disposal or discharge to the environment. Some processes do not require thermal desorption technologies. For example, in the Gulf of Mexico the discharge of cuttings with TPH levels of either 6.9% or 9.4% by weight, depending on the synthetic oil selected, is allowed if other toxicity and biodegradation standards are met or exceeded.

These levels of oil on cuttings can be attained with mechanical systems. However, the trend in environmental regulations is toward greater stringency and therefore an increased demand for minimal TPH levels in treated cuttings will drive the development of more oil-removal technologies.

All thermal desorption processes evaporate the oil and water from the cuttings. The heat required to evaporate the oil and water provides enough energy to remove and separate emulsified oil as well. Free and emulsified oil and water are removed by distillation, and in the process, water evaporates first to produce steam. Oil has a higher boiling point and evaporates after the water. The production of steam can also assist in lowering the boiling point of oil.

The goal is to produce oil-free (or ultra-low TPH) solids for disposal by distilling off oils from the cuttings and recovering oil to be re-used for drilling fluid.

How to Choose a Compact HDD Mud System

We need a compact mud system. Usually it is the first sentence the HDD clients required, HDD is different from Oil & Gas drilling works, not so big rigs, and not so heavy work, and …

GN Solids Control have done a lot of work to optimize the system for the application of HDD project. And we get we paid, after trial our first mud system, CPP like all other clients, repeat their orders, 20 more, 10 more, and repeated.

Each horizontal drilling project is unique, with its own set of challenges. Sometimes these challenges relate to logistics, such as site layout or accessibility. Other sites may present challenges related to a difficult bore profile or infrastructure that complicates navigation. Still others required careful planning and preparation to work within strict administrative rules or regulations. Finally, and generally most significantly, some sites pose challenges imposed by the geology or lithology of the formations to be drilled. Each site has the potential to present a combination of these challenges, particularly those associated with geological conditions.

Then back to the question, how to choose a compact HDD mud system. Firstly, if you know a professional HDD mud system company, no such question, ask them for a proposal. GN Solids Control usually is a good choice.

repeat hdd mud system to cpp

Secondly, ask your self a few questions to recheck your supplier:

1. Did they solve all my questions right now? Any more proposal more than my expected? Like:

2. A professional solution.

3. A lot of customer list.

Download GN Solids Control presentation here, if you want the one with customer names, contact GN consultants.

Health and Safety Executive guide of HDD Project

We’d like to protect the environment,  usually we choose more environmental friendly product. Health and Safety Executive is also a very important part in HDD project. And the the law require us to do the same. Once a customer told us, that is why we choose a professional company to cooperate, and also that is why a lot of consultant company lives. We need good quality products, also competitive price.

In England, HSE is undertaking a campaign to increase compliance with legal requirements for increase compliance with legal requirements for drill rig and pile rig guarding, HDD is an important part of it.

There are complete introduction for usual rigs, small rigs, large rigs. Key parts of rig to which access should be prevented:  Stake down augers.

HDD mud system

In Australia, usually a HDD drilling company will hire one HSE consultant or have one HSE engineer to take part in all process.

As far as we know in Singapore, Hongkong, America, and so on, have special requirements about HSE.

As list in the checklist for HDD in HSE (UK), One important part is: Suitable and Sufficient Risk Assessments and safe system of work developed, Site-specific authorised Permit to drill, Method Statement, Plant Electrical Earthing arrangements satisfactory, site communication arrangements.

GN have cooperated with a lot of Australian clients for HDD project, and also cooperated with CPP for a lot of foreign projects, freely to contact for professional advice.

Or kindly check my next post, how to choose a compact mud system.

JBQ Mud Agitator For Sale

GN supply top quality mud agitatror with competitive price. Highlights of GN-JBQ Mud Agitator:

    • High Efficient Worm Gear Box;mud agitator for Halliburton
  • Explosion Proof Motor;
  • Customized as Your Application Required.

GN Solids Control cooperate very well with famous motor and gear box supplier in China, assistenced by experienced engineer, we always give the user a good solution.

The mud agitator can not only used in Oil Gas Drilling, HDD, & CBM drilling, a lot of Steel Company, Enviomental Protecting company also use GNJBQ mud agitator for keep the charactor of other mixture.

BENEFITS OF JBQ MUD AGITATOR:

Increase performance of solids removal equipment.
– Maintain a uniform mud density.
– Prevents solids settling , taking up valuable tank displacement.quality mud agitator – High shear mixing, aids chemical and solids addition.

FEATURES OF JBQ MUD AGITATOR:

– Compact design.
– Quiet, smooth, vibration free.
– Durable, single reduction worm gear drive.
– Fewer moving parts, less maintenance.
– Direct, flexi-couple drive system.
– Explosion proof electrical system.

Feel free to find more information about JBQ mud agitator from GN Solids Control.

Solid Waste Management Introduction

Waste and pollution management approaches can be described as strategies. Solids control- drilling mud system is one part of it. At the municipal level these strategies traditionally have relied on disposal practices (predominantly landfilling and incineration), whereas industry has employed intermediate steps of treatment and stabilization of the more hazardous wastes.
Industry strategies are based on end-of-pipe treatment technologies, which are more appropriately referred to as control strategies, meaning their aim is really to control emissions and wastes to within legally allowable limits of discharge. Both strategies have two disadvantages:
1. They require ongoing costs that are associated with operations and maintenance and with use of energy, and they carry many hidden and indirect costs and liabilities.
2. Releases of infectious, toxic, and hazardous components to the environment continue for many years, posing long-term health risks to the public and endangerment to the environment simply because waste forms are only transformed and not entirely eliminated or completely immobilized.
Waste/pollution management strategies based on prevention strive to eradicate both of the above disadvantages because they eliminate the pollution or waste at the source. They tend to be only partially successful in reducing the first isadvantage because in a number of cases, P2 strategies rely on technology investments which have OM&R (operation, maintenance, and repair costs) as well as other ongoing costs (e.g., labor, energy). But in general, when properly implemented, they are more cost effective than disposal and treatment technologies. Minimization strategies tend to reduce the risks associated with the second disadvantage, but may also offset some of the costs and liabilities noted with the first disadvantage. Continue reading “Solid Waste Management Introduction”

Shale Shaker for NO Dig 250 ton Drilling Rig

Here we suggest mud recycling system especially the shale shaker for drilling rig250, as the name suggests, offers 250 tonnes.

Mur Recycling System for Rig 250/90

To get the best performace of no dig drilling rig, we need high performance mud recycling system to process drilling fluid at 800gpm.

mud recycling system

It comprises 2 GNPS703 shale shaker for primary screening, and a GNPJ703 mud cleaner complete with two 10″ de-sander cones and 12 deisilter cones for de-sanding and de-silting. All these equipments are mounted one tank to save space. Usually 12meters long with 26 cubic meters net storage.

 Balanced Eliptical Shale Shaker

With the most famous professor in China from Southwest Petro University, we developed our own model shale shaker.
GNZS852, GNZS703, GNPS703 are our updated shaker from this year, after testing and feedback from our clients, this is a big step and successful step.
Balanced elliptical shaker is more compact and more efficient. See more about GNPS shale shaker.