NEWS
6 Sets Solids Removal Unit GN500 GPM for CNPC
GN Solids Control completed 3 sets of the Solids Removal Unit for CNPC division CPPE (China Petroleum Pipeline Engineering Corporation). The total contract is 6 Sets complete 500GPM Solids Removal Unit for the Techless Project.
From 2009, We started working with CPPE for the Solids Removal Unit, before working with GN Solids Control, CPPE took the mud recycling system from US or Europe companies, now GN Solids Control is the Major Solids Removal Unit Supplier for CPPE. Working together with the Biggest HDD Contrator In China brings us more experience for doing the toughest job in HDD industry. Our Solids Removal Unit has been applied for the very high solids content, especially with a lot of fine solids. GN Solids Control provided the four phase solids removal unit for the project from Shale Shaker, to Desander to desilter, and finnally to the Decanter Centrifuge.
Major Equipment of the GN 500GPM Solids Removal Unit:
- 20 Ft Container Size Mud Tank completed with walkway, Handrails, and mud clean gate etc.
- One High G GNZS594 Shale Shaker with Linear Motion.
- One GNZS594-1S8N Mud Cleaner completed with Shale shaker and desander desitlers.
- Two Centrifugal Pumps for feeding the desander and desilter.
GN Compact 500 GPM Solids Removal Unit.
The following photo is another configuration with compact design for, it consist a 20 FT container sized Mud tank completed with tank attachments, and One Double Deck mud cleaner, the bottom shaker for first phase, the upper deck for drying the solids from desilter, and the two centrifugal pumps, one for feeding to desilter, another for feeding mud for the mixing hopper for the mixing function.
More news about GN Solids Removal Unit
- GN Solids Control 500GPM Mud System for CPP China Largest HDD Contractor
- GN 500gpm Solids Removal Unit for Israel Customer
- Drilling Mud Processing Unit Start Operation in NSW Australia
- GN 500GPM Solids Removal System Sent to India Customer in Trenchless Industry
- 2 Sets HDD200 Drilling Mud Solids Removal Unit for CPP
Learn more about CPPE
CPPE was established early seventies last century. Up to now, it has taken over 80% long distance pipeline survey and design market in China that includes completion design of long distance big diameter pipeline projects over 50,000 kilometers and various storage tanks with total volume of 30 million cubic meters and more than ten large scale natural gas treatment plants and oil & gas field construction porjects. Internationaly CPPE has completed design and construction works for various pipeline in length of about 20,000 kilometers in countries as Sudan, Kazakhstan, Lybia, India, Tailand, Pakistan, Kuwait, Iraq, Mozambique, Malaysia, Kenya, Tunis, Uzbekistan, Chad, Niger, etc. Besides CPPE also undertakes consultation, survey and design works for many on-shore and near-shore oil and gas field development, terminals of offshore oil and gas development, petrochemical engineering projects, planning and construction of town, municipal works, power supply.
CPPE's choice for the Solids Removal Unit is a very good reference for your tough job in the HDD solids control solution.