Skid mounted single mud tank system for bentonite mud mixing and recycling are popular for horizontal directional drilling(HDD),water well drilling,geothermal well drilling,and small workover petroleum well drilling rig.
Following we give an example of GN 400 GPM Skid mounted bentonite mud mixing/recycling system made by GN Solids Control in China.
400 GPM Mud Tank System
- One Mud Recycling Tank with dimension:8000Lx2300Wx2100H
- Desander unit with 3 Panel shale shaker mounted by 2×8 inch desander cones
- Desilter unit with 4×6 desilter cones.
- Two 5×6 30Kw centrifugal pump for feeding the hydrocyclone cones
- One 5×6 30 Kw centrifugal pump for mud mixing
- Mud mixing hopper mounted on the tank top side.
- Two mud gun for mud agitation within tank.
- Normal treating capacity for 400GPM with separation cut point:20 Microns
- Submersible slurry pump for feeding shale shaker from mud pit
As a leading China manufacturer for Skid mounted mud recycling and mixing system,GN Solids control design mud tank system for 7000 Gallon,4000 Gallon,2500 Gallon,1500 Gallon,1200 Gallon,etc. as well as customized system with standard solids control equipments.Treating capacity from 1000 GPM to 100 GPM,such as 800 GPM,500 GPM,400 GPM,300 GPM,200 GPM etc.
COMMENTS (3)
monem raza
()
Attn : Manager
Subject: 1. Tender No. SMMC/FP/083/2012, Due on 15.08.2012, for the Supply,
Installation, Testing and Commissioning of 2 x 20 KVA Industrial Grade UPS
at Sui Gas Field Balochistan, Pakistan
2. Tender No. SMMC/FP/095/2012, Due on 15.08.2012, for Supply, Installation,
Testing and Commissioning of Fire & Gas Detection System of DHP at
Khandhkot Gas Field, Pakistan
3. Tender No. SMMC/FP/101/2012, Due on 16.08.2012, for Supply of Prime
Mover (6 x 4) 30 Ton Cap with 40 Ft. Flat Bed Trailer
4. Tender No. SMMC/FP/104/2012, Due on 16.08.2012, for Supply of Skid
Mounted Mud Mixing Hopper
5. Tender No. SMMC/FP/105/2012, Due on 16.08.2012, for the Supply of Mud
Gas Separator
7.
A. FOB/C&F/CIF, Karachi, and complete turnkey project Pakistan prices
B. Bid security 2% of the total value of bid (refundable) along with your offer otherwise your proposal will be disqualified as per tender notice. We cannot arrange/provide.
C. Manufacturer must have 5 years design/manufacturing experience and 3 years successful continuous operational experience for the above subject items. Manufacture must provide the valid API certificate to client.
D. We can arrange the local Civil work/Erection/Testing & Commissioning/Fabrication company for these projects also other services
Dear Sir,
We wish to inform you that PPL invited proposal relating to above subject inquiries. If you are interested in this business, please send us separately by e-mail authority letters in the name of:-
Senior Manager Material & Contracts
Pakistan Petroleum Limited
4Th Floor, PIDC Building,
Dr. Ziauddin Ahmed Road,
Karachi
Pakistan
Tel: 92 21 111568568 Ext 4463 & 4457
Fax:92 21 35683467 & 35680005
Website: http://www.ppl.com.pk / http://www.ppra.org.pk
E-mail: a_shahzad@ppl.com.pk / b_ahmed@ppl.com.pk
for purchase/collect the tender documents on your behalf. Without your authority letter we cannot obtain the tender documents for you. Your immediate response will be highly appreciated. Matter urgent.
Kindly advise your complete company name/address/fax/telephone/name of contact person/mobile phone number etc for our record also send us your company complete catalogs/ company CD and list of products handled by you for our review/reference, so that we may send you all inquiries according to your scope of works.
Best Regards
Monem Raza
Al-waseh International Co, 348-A, M.A. Johar Town, Lahore-54770, Pakistan
Fax: 92 42 35223196 Tel: 92 42 35174345 / 35173601 / 35174564 Mobile: 92 300 8425636
E-mail: kmr19161@gmail.com / khmraza@hotmail.com / kmr19161@yahoo.com / kmr19161@live.com
Skype: monem.raza
Glynda Cable
()
I do enjoy the way you have presented this problem plus it does supply me personally some fodder for thought. However, through everything that I have witnessed, I simply wish as other responses stack on that people today continue to be on point and not start on a soap box of the news du jour. Yet, thank you for this excellent piece and even though I can not really agree with it in totality, I respect your perspective.
Pingback: Skid Mounted Tank VS Trailer Mounted Tank | GN Nodig Mud Recycling System