NEWS
GN Commisioning 1500HP Petroleum Drilling Rig Solids Control System in inner Mongonia
June
21
2011
GN successfully finished the 1500 HP drilling rig mud solids control system in Mongonia,totally,this customer ordered 6 Sets 1500 HP drilling rig solids control system from GN Solids Control.
Configuration of the 1500 HP rig mud system:
- 1)6 Sets Mud Tanks
- 2)3 Sets Linear Motion Shale Shaker
- 3)1 Set Vacuum Degasser
- 4)1 Set Middle Speed Decanter Centrifuge LW450x1000N
- 5)1 Set High Speed Decanter Centrifuge GLW355x1250N
Petroleum drilling is the major division of GN Solids Control system,GN keeps expanding to work with big players in oil drilling around the world.