Shale shaker and Mud cleaner is the basic separation equipment in drilling mud solids control system. Shale shaker is the 1st stage solids control equipment. It is 1st separation equipment to treat the dirt drilling mud from drill holes. Drilling mud cleaner is used after solids control shale shaker. It is the 2nd and / or 3rd solids control separation equipment.
A set of dual tandem shale shaker and mud cleaner package is ready and will be shipped to a drilling company. Dual tandem shale shaker is widely used at work over rig drilling mud recycling system. The dual tandem shale shaker shipped in this project is a combination of Qty 2 GNZS594F-SHBF shale shaker, a mounting skid, and mud distribution pipelines. All of them have 2 motors on each shale shakers.totally 4 motors for a set dual tandem shale shaker package. GNZS594F-SHBF is the model of single shale shaker. It is a single deck linear motion shale shaker.
GNZS594 is the series code of the shaker model. It means the shaker screen width is 590mm. 4 means 4-panel shale shaker. F is the version of the shale shaker. S means solids control shale shaker. GN Solids Control also offers HG (high G drying) shaker for drilling cuttings management. HB means the shale shaker is equipment with back type mud distribution box. F is the design version of the shale shaker.
The mud cleaner in this system is a 1000GPM combo type 3-1 shale shaker. The model of the combo type mud cleaner is GNZJ594F-S2S12NF. It is a combination of Qty 1 solids control shale shaker GNZS594F, Qty 2 × 10 inch desander cone, and Qty 12 × 4 inch desilter cone. The under flow shale shaker model is GNZS594F. In this case, all spare parts are interchangeable with the first step solids control shale shaker. Clients are easy to stock back up spare parts and replacement shaker screens.