Mud cleaning system for 750hp workover drilling rig in Oman

750hp workover drilling rig also called ZJ30 drilling rig. The world top solids control manufacturer GN Solids Control have sent a complete 750hp workover rig mud cleaning system to a drilling company in Oman.

It is a complete mud cleaning system with all the 4 stage solids control and 5 stage treatment. A poor boy degasser (mud gas separator) also included in case of unexpected gas or well blowout) The mud cleaning system offered by GN can be used for both workover and drilling.

750hp workover rig mud cleaning system in Oman
750hp workover rig mud cleaning system in Oman

Equipment included in the 750hp workover rig mud cleaning system:

1) Shale shaker, 2 each, GNZS594 (with the same composite screen with Swaco Mongoose shaker)

2) Vacuum degasser: GNZCQ270

3) Desander, 1 each, GNZJ752-2S

4) Desilter, 1 each, GNZJ752-12N

5) Decanter centrifuge GNLW363G

6) There were four mud tanks that were divided into different compartment for trip tank, sand trap compartment, Centrifuge tank compartment and mixing tank compartment. Optimal design for the tank inner structure ensures the sufficient effective mud storage capacity and easy to layout the pipeline and electric wire cables.

And furthermore, the mud cleaning system also equiped 1 each poor boy degasser (mud gas separator) and 1 set jet mud mixer.

GNZS594 Shale shaker interchaneable with Swaco Mongoose
GNZS594 Shale shaker interchaneable with Swaco Mongoose

In this 750hp workover rig drilling mud cleaning system, we designed both mud mixing hopper system and polymer mud chemicals shearing system where the operators could adding chemicals to keep the mud specific gravity. The multiple mixing pump can circulate the active mud in all tank compartments from the Centrifuge compartment.

If you want more information of drilling mud cleaning system of the 750hp workover rig mud system in Oman, contact GN group freely.