For the mining, GN have made a few customised layout systems, the first one is for Poultry, the customer co-design the system along with GN; then for the coring ming project, we style and design a very small system to get diamond drilling; then some decanter centrifuge with different layout for mining or prospecting water; now another customized system for Philippine mining or prospecting project.
This system contains a shale shaker, two centrifuges. The problems delivered to us is: deep subway, have mining water, having mixtures, different particles, which will destroys the pump which usually keep pumping the lakes and rivers out to keep it able to perform there. The pump is created in German, good quality, but expensive, we want to keep it within good condition, and not easy to get repalcement parts. To sum up, we need another technique to make the pump running properly.
Then we tried a variety of choices, to keep it below ground, or keep it along with the land. To only start using a centrifuge, or use several centrifuges. And questions continually come like do we need shaker, do we need desnader and many others.
With the professional help from clients’ engineer, we finally what is design, and also modify this current operation flow of the mining or prospecting water. Then finally detox the singing water, and then transport to the surface. Considering that the purpose is not for consuming, so do not try.
Furthermore in the mud recycling system, it contains 2 Nemo pump, which is manufactured by German Netsch.
Specifications connected with decanter centrifuge
we have VFD cp to achieve stepless bowl rate adjustment to enhance mud treatment method performance
we use De dos niveles stainless steel SS2205 for centrifuge casting to improve bowl sense of balance, centrifuge balance, as well as progress performance on corrosion weight.
We use Tungsten carbide tiles protecting the twist conveyor impellers to enhance the particular performance when treating large mud.
When the system appear the site, GN solids control engineers should go to the site for the first time having and also operator training. To be sure all goes well and the right way.
Related Posts