One set 500GPM drilling mud recycling system was sent to Middle East for water well drilling. Besides the drilling mud recycling system for oil drilling, they also need drill water well for daily requirement for clean water. For the person living in Middle East, water is more important than oil. Sounds like a joke, but this is reality.
Water well is not so deep like the oil well, and the drilling cost is also very cheap comparing with oil drilling. However, both this 2 drilling processes need the drilling mud recycling system to speed up the drilling process and protect the drill bit. Water well drilling may not need the used drilling mud to be separated very clean as it is not requested strictly. Just like this 500GPM unit shipped to Middle East, it is a very compact
model, while it has all the necessary separation equipment.

It has one unit shale shaker GNZS703DZ with 3 panel screens which could remove out the solids always larger than 300 microns. This model is with the mud feeder on top of the shaker deck so that this shaker could be much more compact. As the water well drilling is always not so deep, hence, the solids coming out with the drilling mud is always not so hard. In this 500GPM mud recycling system, the de-sander cone is not equipped, but directly the de-silter cone would be used to separate the solids size of around 20 microns.
This 500GPM water well drilling mud system is a standard GN model GNMS-500G with 2 unit centrifugal pumps. One of each is used as feeding pump for the de-silter cyclone, and the other one is used for mud mixing, the mud tank is divided into 2 compartments. It has enough space for clean mud storage.
Though this 500GPM mud system is for water well drilling, it can also be used in other drilling project like HDD. As the working principle is completely the same. The customer killed two birds with only one stone.